This page is the long version of a simple promise: everything is designed, everything is tested, everything is written down. Here is exactly what that means on your site.

The five steps

From brief to keys.

  1. 01 BRIEF

    Listen

    A 45-minute call or office visit. We learn how you live or how your business runs, what you must have, and what you refuse to compromise on.

    Output: Written brief and budget band

  2. 02 DESIGN

    Engineer

    Architects and structural engineers design together, so the plan you fall in love with is the plan that can be built, on budget, to code.

    Output: Drawings, 3D views, fixed BOQ

  3. 03 AGREE

    Contract

    A plain-language contract with the scope, the schedule, the named materials and a milestone payment plan. No hidden extras, ever.

    Output: Signed contract and schedule

  4. 04 EXECUTE

    Build

    A resident engineer on site every day, lab tests for every pour, and a Friday report with photos, spend and next week’s plan.

    Output: Weekly reports and milestone sign-offs

  5. 05 DELIVER

    Hand over

    A joint inspection with a snag list closed to zero, as-built drawings, warranties, and keys in your hand on the date we promised.

    Output: Keys, warranty card, as-builts

Testing

Tested, not trusted.

Every material on a HashBuy site is tested by an accredited third-party lab. The results go in your weekly report, so you see them before we do anything irreversible.

MaterialTestStandardFrequency
ConcreteCube compressive strength at 7 and 28 days, slump test on every pourASTM C39 / BS EN 12390Every pour
Steel reinforcementMill certificate check, tensile and bend test on samplesASTM A615 Grade 60Every delivery
BricksCompressive strength and water absorptionASTM C67Every kiln batch
SoilBore log, SPT, bearing capacity and water tableASTM D1586Before design
PlumbingPressure test on all supply lines before concealment1.5x working pressure, 24 hEvery line
WaterproofingFlood test on roofs and wet areas48 h pondingEvery slab and bathroom

Reporting

The Friday report.

Every Friday, every project, since the first one. Photos, a short video, spend against budget, lab results, schedule status, next week's plan and any decision we need from you. It takes you five minutes to read and it means you never have to ask.

  • Site photos and a two-minute walkthrough video
  • Spend to date against the contract, with invoices attached
  • Lab results for the week's pours and deliveries
  • Schedule status against the programme
  • Decisions needed from you, with a deadline and our recommendation
  • A live dashboard link for turnkey clients
Friday report · sample On schedule

Kanal Residence, DHA Phase 6

Week
23 of 52
Stage
First floor slab
This week
Shuttering complete, steel inspected, slab poured Thu, 18 cubes cast
Lab
7-day cubes from GF slab: 24.8 MPa (target 21)
Spend to date
PKR 1.42 cr of 2.60 cr (54.6%)
Schedule
2 days ahead
Next week
Curing, first-floor masonry, electrical conduits
Decisions needed
Confirm facade stone sample B by Tuesday

Illustrative. Real reports include photos, video and attached invoices.

Standards

Six things we do on every site.

01

Engineers, not middlemen

Every HashBuy project is run by a degree-qualified engineer who is on site, not a contractor who subcontracts the thinking.

02

Fixed scope, fixed price

A bill of quantities with named brands and a contract that only changes when you ask it to. The number you sign is the number you pay.

03

Tested, not trusted

Concrete cubes, steel certificates and brick crush tests for every delivery. Results go in your weekly report.

04

Friday report, every Friday

Photos, videos, spend-to-date, schedule status and next week’s plan. From Lahore or London, you always know.

05

On time, or we pay

Our contracts carry a delay clause with a daily penalty we pay you. That is how confident we are in our programmes.

06

Warranty you can call

Twelve months on finishes and a long-term structural warranty, with a named engineer who answers the phone.

Safety

Helmets, harnesses above two metres, edge protection and a trained first-aider on every site. A NEBOSH-certified manager audits monthly. We send workers home with the same number of fingers they arrived with.

Warranty

Twelve months on finishes and workmanship. Long-term structural warranty on foundations and frame. A named engineer you can call, not a help desk.

Delay clause

Our contracts carry a daily penalty paid by HashBuy if we miss the agreed date. Exclusions are written down and limited to weather, force majeure and client-caused delay.